Hello,
I want to confirm the MC's placing order behavior.
Which way is correct?
In Default mode (Intra-Bar Order Generation (IOG) disabled),
1.MC received the last tick (close)---->signal calculate----->plot bar/arrow appears----->placing order
or
2.MC received the last tick (close)---->signal calculate and plot bar(simultaneously)/arrow appears----->placing order
The difference between 2 way is the behavior of signal calculating and plotting bar are at the same time or in sequence?
MC's placing order behavior
- Henry MultiСharts
- Posts: 9165
- Joined: 25 Aug 2011
- Has thanked: 1264 times
- Been thanked: 2957 times
Re: MC's placing order behavior
Hello Mog,
Signal calculation and bar plotting are done almost simultaneously.
Signal calculation and bar plotting are done almost simultaneously.