Hi there,
I open 4 charts on my Multicharts screen. Their time frame is different. they are 1m, 1H, 1D and 1W Individually.
I would like to change all to chart time frame to 1H. I need to change 3 charts. Is there any function key that I could click and all the 4 charts time frame will change to 1H time frame?
Thanks for your help.
Charles
Change several chart time frame at the same time [SOLVED]
- arnie
- Posts: 1594
- Joined: 11 Feb 2009
- Location: Portugal
- Has thanked: 481 times
- Been thanked: 514 times
Re: Change several chart time frame at the same time [SOLVED]
Have you tried to link them through their resolution?Hi there,
I open 4 charts on my Multicharts screen. Their time frame is different. they are 1m, 1H, 1D and 1W Individually.
I would like to change all to chart time frame to 1H. I need to change 3 charts. Is there any function key that I could click and all the 4 charts time frame will change to 1H time frame?
Thanks for your help.
Charles
Format Window > Status Line > enable Resolution Link (if unabled) and go to the Status BAr and select the same color for all 4 charts.
One of the problems is that for you to go back to have each chart with different resolution you'll need to unable the link by selecting the Not Linked option.