I'm using TS for my data feed. They were missing one day of data and I was able to fix it in TS. However, my multicharts wasn't able to fill in the missing day. How can I fill this in?

drwar
Posts: 218
Joined: 31 Jul 2005

Re: Missing Data

Postby drwar » 14 Aug 2008

[quote]I'm using TS for my data feed. They were missing one day of data and I was able to fix it in TS. However, my multicharts wasn't able to fill in the missing day. How can I fill this in?[/quote]

I assume you tried a reload. Sometimes that will fix it if its a cashe problem if not.

1) Check to see the data is really missing by checking database in QM after opening the chart up. If it isn't then its your cashe , just clear it for that symbol before loading the chart.

If that hasn't resolved it.

2) In TS Load a chart with tick data from the symbol you want. from the main menu , select view | Data window and select show all. You may have to adjust the background and value colors to see the data. Then copy and past the day you want to a text file. THen import ascii via QM into the symbol with the missing data.

J~

t123knight
Posts: 50
Joined: 11 Nov 2005
Contact:

Postby t123knight » 18 Aug 2008

Thanks. That has fixed the problem.

drwar
Posts: 218
Joined: 31 Jul 2005

Postby drwar » 18 Aug 2008

[quote]Thanks. That has fixed the problem.[/quote]

YW