How could i get MC to perform a periodic walkforward
For eg, what i would like is to optimise values for say 2000 - 2004, and then walk forward for the year 2005, and then again optimise for now 2001 - 2005 and walk forward for 2006
and then again now optimise for 2002 - 2006 and now walk forward for 2007
Something along these lines is what i would like the system to do
Is it possible?
How to to periodic walk forward
- JoshM
- Posts: 2195
- Joined: 20 May 2011
- Location: The Netherlands
- Has thanked: 1544 times
- Been thanked: 1565 times
- Contact: