Datestamp on recompiling

Questions about MultiCharts and user contributed studies.
Posts: 197
Joined: 29 Jun 2007
Has thanked: 8 times
Been thanked: 8 times

Datestamp on recompiling

Postby jl12 » 16 Jul 2011

Every time a new version is loaded and the studies are recompiled the date of all of the studies is reset.
This prevents any reference to what was modified when.

Is it possible to prevent this or ideally change the date-stamp only when modified not recompiled

Posts: 2036
Joined: 21 Jul 2007
Has thanked: 178 times
Been thanked: 407 times

Re: Datestamp on recompiling

Postby bowlesj3 » 16 Jul 2011

Why not create a Project management request for two dates (compiled and last updated) and include the link in here and I will vote for it.

Return to “MultiCharts”