MultiCharts Easter Sale has jumped in! Up to 50% off Explore offers
+1 888 340 6572
MultiCharts Project Management
previous_open_issue.png
Go to the previous open issue
previous_issue.png
Go to the previous issue (open or closed)
star_faded.png
Please log in to bookmark issues
feature_request_small.png
Open Feature request MC-1956

different strategies within a Portfolio, to have different Data-Ranges

action_vote_minus_faded.png
1
Votes
action_vote_plus_faded.png
next_issue.png
Go to the next issue (open or closed)
next_open_issue.png
Go to the next open issue
Description

It would be very useful to be able to set different Data-Ranges to different Strategies, or to different instruments within a strategy.
Usecases would be from symultaneously testing a strategy in different time-frames to symultaneously testing the same instrument in different timeframes, with different parameters set.
This would tie perfectly with Walk-Forward-Optimization, where each Data-Range could be an Out-Of-Band time-frame with its own individual parameters, and would provide true OutOfBand statistics for an instrument.

Steps to reproduce this issue

FR

Comments (0)
There are no comments
History
Issue basics
  • Type of issue
    Feature request
  • Category
    Usability
  • Targeted for
    Not determined
  • Status
    Not Reviewed
User pain
  • Type of bug
    Not triaged
  • Likelihood
    Not triaged
  • Effect
    Not triaged
Affected by this issue (2)
People involved
Times and dates
  • Posted at
  • Last updated
Issue details
  • Resolution
    Not determined
  • Severity
    Normal
Attachments (0)
There is nothing attached to this issue
Commits (0)
There are no code checkins for this issue
Duplicate issues (0)
This issue does not have any duplicates