MultiCharts Easter Sale has jumped in! Up to 50% off Explore offers
+1 888 340 6572
MultiCharts Project Management
previous_open_issue.png
Go to the previous open issue
previous_issue.png
Go to the previous issue (open or closed)
star_faded.png
Please log in to bookmark issues
feature_request_small.png
Open Feature request MC-1998

Programmatically linking and changing indicator inputs from a strategy optimization or manual input

action_vote_minus_faded.png
0
Votes
action_vote_plus_faded.png
next_issue.png
Go to the next issue (open or closed)
next_open_issue.png
Go to the next open issue
Description

When programming a signal strategy in PowerLanguage there are usually confirming indicators that are referrenced for the strategy.  For example, the lookback length of a stochastic.
If programming a strategy and one of the inputs is the stohastic lookback length, it would be nice to be able to change your strategy settings via optimization or manual entry and have the corresponding indicator values change to reflect the changes made so that they are constantly synced.
Thank you.
DaveDM

Steps to reproduce this issue

N/A

Comments (0)
There are no comments
History
Issue basics
  • Type of issue
    Feature request
  • Category
    Usability
  • Targeted for
    Not determined
  • Status
    Not Reviewed
User pain
  • Type of bug
    Not triaged
  • Likelihood
    Not triaged
  • Effect
    Not triaged
Affected by this issue (2)
People involved
Times and dates
  • Posted at
  • Last updated
Issue details
  • Resolution
    Not determined
  • Severity
    Normal
Attachments (0)
There is nothing attached to this issue
Commits (0)
There are no code checkins for this issue
Duplicate issues (0)
This issue does not have any duplicates