Difference between revisions of "Backtesting a Portfolio"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
<br> | <br> | ||
− | Once a portfolio has been created, strategy configured, and portfolio settings selected, the portfolio can be backtested. | + | Once a portfolio has been created, a strategy configured, and portfolio settings selected, the portfolio can be backtested. |
<br>To backtest a portfolio: | <br>To backtest a portfolio: | ||
Line 9: | Line 9: | ||
<br>Backtesting a portfolio will generate a [[Portfolio_Performance_Report|Portfolio Performance Report]] that will be displayed in a separate window. | <br>Backtesting a portfolio will generate a [[Portfolio_Performance_Report|Portfolio Performance Report]] that will be displayed in a separate window. | ||
− | + | A description for each performance measure is described in the Report. | |
<br> | <br> | ||
[[Category:Portfolio Backtester]] | [[Category:Portfolio Backtester]] |
Revision as of 17:53, 9 July 2014
Once a portfolio has been created, a strategy configured, and portfolio settings selected, the portfolio can be backtested.
To backtest a portfolio:
- Click the BackTest button on the toolbar, or
- Select Portfolio in the main menu and then select Run Backtesting.
Backtesting a portfolio will generate a Portfolio Performance Report that will be displayed in a separate window.
A description for each performance measure is described in the Report.