Difference between revisions of "Backtesting a Portfolio"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
<br> | <br> | ||
Once a portfolio has been created, a strategy configured, and portfolio settings selected, the portfolio can be backtested. | Once a portfolio has been created, a strategy configured, and portfolio settings selected, the portfolio can be backtested. | ||
− | |||
<br>To backtest a portfolio: | <br>To backtest a portfolio: | ||
+ | * Open '''Portfolio Trader''' window. | ||
+ | ** see [[Portfolio Trader#Opening Portfolio Trader|how]] | ||
* Click the '''BackTest''' [[File:BacktestPortfolio.png]] button on the toolbar, or | * Click the '''BackTest''' [[File:BacktestPortfolio.png]] button on the toolbar, or | ||
* Select '''Portfolio''' in the main menu and then select '''Run Backtesting'''. | * Select '''Portfolio''' in the main menu and then select '''Run Backtesting'''. |
Revision as of 16:06, 30 September 2014
Once a portfolio has been created, a strategy configured, and portfolio settings selected, the portfolio can be backtested.
To backtest a portfolio:
- Open Portfolio Trader window.
- see how
- Click the BackTest button on the toolbar, or
- Select Portfolio in the main menu and then select Run Backtesting.
Backtesting a portfolio will generate a Portfolio Performance Report that will be displayed in a separate window.
A description for each performance measure is described in the Report.