Difference between revisions of "Portfolio GetMaxPotentialLossPerContract"
Jump to navigation
Jump to search
(→Usage) |
m (Reverted edits by 176.8.90.7 (talk) to last revision by JoshM) |
||
Line 3: | Line 3: | ||
* A numerical value indicated in the $ box, if the '''Absolute Max Potential Loss''' option is selected in the '''Format Settings''' dialog window under the [[Portfolio Settings]] tab. | * A numerical value indicated in the $ box, if the '''Absolute Max Potential Loss''' option is selected in the '''Format Settings''' dialog window under the [[Portfolio Settings]] tab. | ||
− | + | == Usage == | |
− | + | <syntaxhighlight>Portfolio_GetMaxPotentialLossPerContract</syntaxhighlight> | |
+ | |||
== Notes == | == Notes == | ||
This function can only be used in signals intended to be used with the [[:Category:Portfolio_Backtesting|Portfolio Backtester]]. | This function can only be used in signals intended to be used with the [[:Category:Portfolio_Backtesting|Portfolio Backtester]]. |
Revision as of 13:12, 13 February 2012
Returns one of the following:
- A numerical value indicated in the % box multiplied by -1, if the Max Potential Loss option is selected in the Portfolio Settings dialog window under the Portfolio Settings tab, or:
- A numerical value indicated in the $ box, if the Absolute Max Potential Loss option is selected in the Format Settings dialog window under the Portfolio Settings tab.
Usage
Portfolio_GetMaxPotentialLossPerContract
Notes
This function can only be used in signals intended to be used with the Portfolio Backtester.
Example
Portfolio_GetMaxPotentialLossPerContract
Will return -5 if the Max Potential Loss option is selected and % box value is 5 under the Portfolio Settings tab in the Format Settings dialog window.
Portfolio_GetMaxPotentialLossPerContract
Will return 0.001 if the Absolute Max Potential Loss option is selected and $ box value is 0.001 under the Portfolio Settings tab in the Format Settings dialog window.