RectangleNew s
From MultiCharts
Displays a rectangle, with the specified starting and ending points, on the chart that the study is based on; returns a rectangle-specific ID number, required to modify the rectangle.
Usage
RectangleNew_s (sDate, sTime_s, sPriceValue, eDate, eTime_s, ePriceValue)
Parameters
- sDate - a numerical expression specifying the rectangle starting point date; the date is indicated in the YYYMMdd format, where YYY is the number of years since 1900, MM is the month, and dd is the day of the month
- sTime_s - a numerical expression specifying the rectangle starting point time, including seconds; the time is indicated in the 24-hour HHmmss format, where 130000 = 1:00:00 PM
- sPriceValue - a numerical expression specifying the rectangle starting point price value (vertical position, corresponding to a value on the price scale of a chart)
- eDate - a numerical expression specifying the rectangle ending point date
- eTime_s - a numerical expression specifying the rectangle ending point time, including seconds
- ePriceValue - a numerical expression specifying the rectangle ending point price value
Example
Display a rectangle, that covers last 10 bars on the chart that the study is based on:
Value1=RectangleNew_s(date[10],time_s[10],Highest(high, 10),date,time_s,Lowest(low, 10));