TL GetEndDate
Returns a numerical value, indicating the date of the ending point of a trendline with the specified ID number; returns a value of -2 if the specified trendline ID number is invalid.
Of the two end points of a trendline, the point with the later date and time is always considered to be the ending point; if the trendline is vertical, the point with the higher price value is considered to be the ending point.
The date is indicated in the YYYMMdd format, where YYY is the number of years since 1900, MM is the month, and dd is the day of the month.
Usage
TL_GetEndDate(TL_ID)
Where: TL_ID - a numerical expression specifying the trendline ID number
Notes
A trendline-specific ID number is returned by TL_New when the trendline is created.
Example
Assign a value, indicating the date of the ending point of a trendline with the ID number of 3, to Value1 variable:
Value1=TL_GetEndDate(3);