Changes

Jump to navigation Jump to search

Backtesting a Portfolio

No change in size, 17:53, 9 July 2014
no edit summary
<br>
Once a portfolio has been created, a strategy configured, and portfolio settings selected, the portfolio can be backtested.
<br>To backtest a portfolio:
<br>Backtesting a portfolio will generate a [[Portfolio_Performance_Report|Portfolio Performance Report]] that will be displayed in a separate window.
The A description for each performance measure is described in the Report.
<br>
[[Category:Portfolio Backtester]]

Navigation menu