Optimization Pause for Portfolio Backtester

Questions about MultiCharts and user contributed studies.
aconnery
Posts: 32
Joined: 21 Apr 2013
Has thanked: 9 times
Been thanked: 4 times

Optimization Pause for Portfolio Backtester

Postby aconnery » 22 Apr 2014

This is just a suggestion, but I think it would be really useful to have a 'pause and resume' optimization feature, especially when optimizing large baskets of stock. Such optimizastions can take a long time, maybe several hours or longer and, given that the optimization criteria in MC is pretty inflexible, at least the ability to review results and apply them to see the portfolio summary during the process would help to make a brief evaluation as to whether the criteria used (e.g. % profitable) would be suitable to 'resume' or whether the process should be reset.

User avatar
Andrew MultiCharts
Posts: 1587
Joined: 11 Oct 2011
Has thanked: 931 times
Been thanked: 559 times

Re: Optimization Pause for Portfolio Backtester

Postby Andrew MultiCharts » 23 Apr 2014

Hello aconnery,

Please vote for the respective feature request.


Return to “MultiCharts”