Study on study: Difference between revisions
From MultiCharts
(Created page with "From MultiCharts 8.8 beta 1 it is possible to use the values of another indicators as inputs for the indicator. File:Indicator on indicator.png To select an indicator v...") |
No edit summary |
||
(9 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
It is possible to use the values of other indicators as inputs for indicator or signal. | |||
[[File:Indicator on indicator.png]] | [[File:Indicator on indicator.png]] | ||
Line 8: | Line 8: | ||
# In Format Study --> Inputs tab click the input value, | # In Format Study --> Inputs tab click the input value, | ||
# Click the ... button to select the indicator to be used as an input value, | # Click the ... button to select the indicator to be used as an input value, | ||
# Select the indicator | # Select the required indicator and click Ok, | ||
# Select the plot value to be used as an input value, | # Select the plot value to be used as an input value, | ||
# Click Ok. | # Click Ok. | ||
Line 22: | Line 22: | ||
# Indicator: - keyword, is obligatory, | # Indicator: - keyword, is obligatory, | ||
# "Name of indicator" - string value (in quotes) representing. Is obligatory. | # "Name of indicator" - string value (in quotes) representing. Is obligatory. | ||
# plotN - plot number is to be used for calculations. Example - plot1, plot2 etc. Is optional parameter. If not specified, the plot with the | # plotN - plot number is to be used for calculations. Example - plot1, plot2 etc. Is optional parameter. If not specified, the plot with the smaller number is used. | ||
# | - delimiter. | # | - delimiter. | ||
# Input_name = Input_Value - setting certain value for a certain input. Is optional parameter. | # Input_name = Input_Value - setting certain value for a certain input. Is optional parameter. | ||
<div style="background-color: #E3FBE5;">'''Note: | <div style="background-color: #E3FBE5;">'''Note: In MultiCharts .NET this functionality is not available through study inputs. One can access objects of one study from the another one in the code:[http://www.multicharts.com/discussion/viewtopic.php?f=19&t=12593#p100345 C# example]; [http://www.multicharts.com/discussion/viewtopic.php?f=19&p=111183#p111183 VB.NET example]'''</div> | ||
[[Category: | [[Category:Studies]] |
Latest revision as of 15:24, 2 August 2021
It is possible to use the values of other indicators as inputs for indicator or signal.
To select an indicator value as an input:
- Apply the indicator to the chart,
- In Format Study --> Inputs tab click the input value,
- Click the ... button to select the indicator to be used as an input value,
- Select the required indicator and click Ok,
- Select the plot value to be used as an input value,
- Click Ok.
The line in the input field is
Indicator: "Name of indicator" plotN | Input_Name = Input_Value
where:
- Indicator: - keyword, is obligatory,
- "Name of indicator" - string value (in quotes) representing. Is obligatory.
- plotN - plot number is to be used for calculations. Example - plot1, plot2 etc. Is optional parameter. If not specified, the plot with the smaller number is used.
- | - delimiter.
- Input_name = Input_Value - setting certain value for a certain input. Is optional parameter.
Note: In MultiCharts .NET this functionality is not available through study inputs. One can access objects of one study from the another one in the code:C# example; VB.NET example