+1 888 340 6572

Backtesting a Portfolio: Difference between revisions

From MultiCharts
No edit summary
No edit summary
Line 1: Line 1:
<br>
<br>
Once a portfolio has been created, strategy configured, and portfolio settings selected, the portfolio can be backtested.  
Once a portfolio has been created, a strategy configured, and portfolio settings selected, the portfolio can be backtested.  


<br>To backtest a portfolio:
<br>To backtest a portfolio:
Line 9: Line 9:
<br>Backtesting a portfolio will generate a [[Portfolio_Performance_Report|Portfolio Performance Report]] that will be displayed in a separate window.   
<br>Backtesting a portfolio will generate a [[Portfolio_Performance_Report|Portfolio Performance Report]] that will be displayed in a separate window.   


The description for each performance measure is described in the Report.
A description for each performance measure is described in the Report.


<br>
<br>


[[Category:Portfolio Backtester]]
[[Category:Portfolio Backtester]]

Revision as of 17:53, 9 July 2014


Once a portfolio has been created, a strategy configured, and portfolio settings selected, the portfolio can be backtested.


To backtest a portfolio:

  • Click the BackTest button on the toolbar, or
  • Select Portfolio in the main menu and then select Run Backtesting.


Backtesting a portfolio will generate a Portfolio Performance Report that will be displayed in a separate window.

A description for each performance measure is described in the Report.