+1 888 340 6572

Backtesting a Portfolio: Difference between revisions

From MultiCharts
No edit summary
No edit summary
Line 10: Line 10:


The description for each performance measure is [[<span style="color: red;">'''LINK'''</span> /0297_Portfolio/22-8004_BTReport.html name="2";  |described in the report]].
The description for each performance measure is [[<span style="color: red;">'''LINK'''</span> /0297_Portfolio/22-8004_BTReport.html name="2";  |described in the report]].
<br>
<br>


[[Category:Portfolio Backtesting]]
[[Category:Portfolio Backtesting]]

Revision as of 23:11, 7 February 2012


Once a portfolio has been created, strategy configured, and portfolio settings selected, the portfolio can be backtested.


To backtest a portfolio:

  • Click the BackTest 05_Backtest.gif button on the toolbar, or
  • Select Portfolio in the main menu and then select Run Backtesting.


Backtesting a portfolio will generate a [[LINK /0297_Portfolio/22-9705_PortfolioPerfRep.html name=""; |Portfolio Performance Report]] that will be displayed in a separate window.

The description for each performance measure is [[LINK /0297_Portfolio/22-8004_BTReport.html name="2"; |described in the report]].