Hello Fibdax,
This is not a trivial issue and it requires additional time for analysis. There is no ETA at the moment.
I will keep the board posted.
This is not a trivial issue and it requires additional time for analysis. There is no ETA at the moment.
I will keep the board posted.
Re: Trendline charts problem 8.0 beta3
I have installed the latest version 8.5 and is the same problem
Is not this a major problem?
Is not this a major problem?
- Attachments
-
- tl2.gif
- (78.83 KiB) Downloaded 955 times
-
- TLup2.GIF
- (86.22 KiB) Downloaded 948 times
-
- TLup.GIF
- (95.68 KiB) Downloaded 939 times
-
- TLDwn.GIF
- (89.77 KiB) Downloaded 953 times
- arnie
- Posts: 1594
- Joined: 11 Feb 2009
- Location: Portugal
- Has thanked: 481 times
- Been thanked: 514 times
Re: Trendline charts problem 8.0 beta3
It's an annoying problem.I have installed the latest version 8.5 and is the same problem
Is not this a major problem?
This happens because the line lost its end time coordinate.
The line moved because when you zoomed in somehow MC lost the original end time coordinate so it adjusted the line to the last time available.
A couple weeks ago I remember sending to MC staff a possible solution to this, which is add a third point on the line which would serve as a secondary end point. This way, everytime the end point would be out of range, that secondary point would maintain the line with its original slope. That third point would be always set to the last bar on the chart.
- Attachments
-
- TL.GIF
- (52.41 KiB) Downloaded 1089 times
- Henry MultiСharts
- Posts: 9165
- Joined: 25 Aug 2011
- Has thanked: 1264 times
- Been thanked: 2957 times
Re: Trendline charts problem 8.0 beta3
arnie, fibdax, there should be no such problem if Chart Shift option is set to "Bars" in Format->Window->X-time scale.
We are looking into improving the behavior with Chart Shift specified in percent.
We are looking into improving the behavior with Chart Shift specified in percent.
- Henry MultiСharts
- Posts: 9165
- Joined: 25 Aug 2011
- Has thanked: 1264 times
- Been thanked: 2957 times
Re: Trendline charts problem 8.0 beta3 [SOLVED]
Unfortunately there is no technical possibility for improving this behavior at the moment.
Please use the provided workaround:
Set Chart Shift option to "Bars" in Format->Window->X-time scale.
Please use the provided workaround: