I have a study with the following code:
Code: Select all
PR = 100*PercentRank(RateOfChange(C,1),RateOfChange(C,1),iLenROC+1);
However the result that is produced when I plot this study is rounded to the closest integer. So I end up with a result such as 81.0000 instead of getting the exact figure to 4 decimal places.
I have tried everything but I can't figure out what I am doing wrong with this.