Post-Optimization Risk Description Error
Post-Optimization Risk Description Error
"Calculated as the average maximum drawdown of all OOS intervals multiplied by 1.5."
Please refer to this topic:
viewtopic.php?t=51843
- Tammy MultiCharts
- Posts: 200
- Joined: 06 Aug 2020
- Has thanked: 6 times
- Been thanked: 65 times
Re: Post-Optimization Risk Description Error
Hello scotthkao,
Thanks for pointing that mistake out!
It will be corrected in the nearest release.
Thanks for pointing that mistake out!
It will be corrected in the nearest release.