I want to plot a vertical line daily at 0700 hrs.
how could I do that?
Daily vertical time line [SOLVED]
- TJ
- Posts: 7743
- Joined: 29 Aug 2006
- Location: Global Citizen
- Has thanked: 1033 times
- Been thanked: 2223 times
Re: Daily vertical time line
Try this:I want to plot a vertical line daily at 0700 hrs.
how could I do that?
Code: Select all
If TIME = 700 then PLOT1( h*2, "0700") // set plot style as histogram
else noplot(1);
-
- Posts: 61
- Joined: 25 Jul 2013
- Has thanked: 18 times
- TJ
- Posts: 7743
- Joined: 29 Aug 2006
- Location: Global Citizen
- Has thanked: 1033 times
- Been thanked: 2223 times
Re: Daily vertical time line [SOLVED]
Have you tried to apply the code?h should be a variable?
h = HIGH