Please see the attached images.
MC.net date range_1.png
This is the screenshot of the format instrument settings data range that I have manually set it to.
Now save the workspace and close down MC.net then restart it. Open the same workspace and look at the format instruments setting data range.
MC.net date range_2.png
This is a screenshot of the format instrument settings data range after restarting MC.net
MC.net threw away my "To" date and replaced it with todays date. Why does it only remember the "From" date and not the "To" date. This is a user specified range and as such needs to be remembered.
Chart settings Data Range altered between MC.net runs [SOLVED]
Chart settings Data Range altered between MC.net runs
- Attachments
-
- MC.net date range_2.png
- (56.44 KiB) Downloaded 413 times
-
- MC.net date range_1.png
- (59.6 KiB) Downloaded 411 times
- JoshM
- Posts: 2195
- Joined: 20 May 2011
- Location: The Netherlands
- Has thanked: 1544 times
- Been thanked: 1565 times
- Contact:
Re: Chart settings Data Range altered between MC.net runs [SOLVED]
If you click on the button the data range is remembered. See point 7 under 'Setting bars/days back' on this wiki page.MC.net threw away my "To" date and replaced it with todays date. Why does it only remember the "From" date and not the "To" date. This is a user specified range and as such needs to be remembered.